This Old House · Season 33 · Episode 25

“The Barrington Beach House: The Finish Line”

Aired Friday 23 March 2012

Light green grout is used with the glass tile backsplash. The garage gets an insulated steel door and storage system. A cable railing system is installed. A gas stove is installed in the living room. The new lighting design is shown.

S33 E25 discussion

No one has started this one yet

Be the first to say what you thought of “The Barrington Beach House: The Finish Line”. Spoiler tags keep it safe for people who are behind.

Start the S33 E25 thread